{"id":255,"date":"2016-02-07T18:58:58","date_gmt":"2016-02-07T15:58:58","guid":{"rendered":"https:\/\/www.arabenergyalliance.com\/license-areas-copy\/"},"modified":"2023-03-13T15:28:48","modified_gmt":"2023-03-13T13:28:48","slug":"development-and-exploutation","status":"publish","type":"page","link":"https:\/\/www.arabenergyalliance.com\/en\/activities\/development-and-exploutation\/","title":{"rendered":"Development and exploutation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column css=&#8221;.vc_custom_1678455946364{padding-bottom: 22px !important;}&#8221;][vc_column_text]Company conducted re-processing and re-interpretation of seismic and geophysical data during 2009-2012. According to results of seismic using 3D method were identified perspectives of drilling the well # 116-A Bilousivska. The well # 116-A Bilousivska OGCF was drilled in the period from August 2009 to May 2010 with target depth of 4428m TD and where was tested a number of productive formations from T-1 to B-20.<\/p>\n<p>In accordance with license liabilities of North Yablunivska Area the company was drilled exploration directional well # 203-A with target depth of 4950m TD. The well has been achieved and successfully tested the productive formation of B-22 horizon. At this time the well is producing from this production horizon.<\/p>\n<p>The drilling of development well # 9-A Bilousivska was started at the end of 3rd quarter of 2013. The well has been achieved a target depth of 3990m TD in November 2013. According to drilling data was conducted a clarifications for border of B-20l productive formation and geological structure of Bilousivske OGCF in this locality through Upper Visean sediments area. The company planned to drill a lateral hole from existing well # 9-A in the north-east line based on analysis in order to enter the B-20l productive formation and bring this pay zone to commercial development.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_single_image image=&#8221;280&#8243; img_size=&#8221;full&#8221;][\/vc_column][\/vc_row][vc_row][vc_column css=&#8221;.vc_custom_1678114226223{padding-top: 22px !important;padding-bottom: 22px !important;}&#8221;][vc_column_text]The company management decided to begin preparation works for drilling the new evaluation well # 20 Chornukhy GCF with design depth of 3750m TD to develop the remaining reserves of B-20u formation according to commercial development project. The deposits of C1 category of two formations B-17l and B-20u can be entered in apical part of Chornukhy structural high due to drilling this well which allow clearly described prospectivity of their further development.<\/p>\n<p>Also, it would be more detailed learned the deposits of Lower Visean due to well enter the section to Tournai deposits.<\/p>\n<p>The development of Bilousivske oil, gas and condensate field (OGCF) is performed by three wells^ BC#7, 17, 110 and Chornukhy gas and condensate field \u2013 by Ch#3-A.<\/p>\n<p>Well NY#203-A is under pilot development on North-Yablunivske field.<\/p>\n<p>Wells BC#7, 17 are producing with Gas Lift, BC#110 \u2013 was producing with GL during clean up from technical water period, then \u2013 flowing.<\/p>\n<p>Ch#3-A is producing with wellhead compressor.<\/p>\n<p>Wells BC#7, 17, 110 and Ch#3-A are connected to the Gas Plant at Bilousivske field, where treatment of gas is performed and its transfer to the Kursk-Kyiv pipeline.<\/p>\n<p>Well NY#203-A is hooked up with inhibitor pump station and metering station, and connected to Yarivska Gas Plant.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column css=&#8221;.vc_custom_1678455946364{padding-bottom: 22px !important;}&#8221;][vc_column_text]Company conducted re-processing and re-interpretation of seismic and geophysical data during 2009-2012. According to results of seismic using 3D method were identified perspectives of drilling the well # 116-A Bilousivska. The well # 116-A Bilousivska OGCF was drilled in the period from August 2009 to May 2010 with target depth of 4428m&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":98,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-255","page","type-page","status-publish","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/pages\/255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/comments?post=255"}],"version-history":[{"count":223,"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/pages\/255\/revisions"}],"predecessor-version":[{"id":2380,"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/pages\/255\/revisions\/2380"}],"up":[{"embeddable":true,"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/pages\/98"}],"wp:attachment":[{"href":"https:\/\/www.arabenergyalliance.com\/en\/wp-json\/wp\/v2\/media?parent=255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}